User Tools

Site Tools


mbse:incose_mbse_iw_2015

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
mbse:incose_mbse_iw_2015 [2015/01/24 12:19]
peak Mon - added several items: TIIWG, BKASE MBSE, SSWG, MBCD; moved note
mbse:incose_mbse_iw_2015 [2015/01/26 12:10]
sfriedenthal
Line 55: Line 55:
 |16:​45-17:​30 ​ |MBSE Survey Results | |16:​45-17:​30 ​ |MBSE Survey Results |
  
-*Keynote: Transformation of the Building industry – From Traditional to Digital: Patrick MacLeamy (CEO, HOK and Chair, buildingSMART International)+{{mbse:​incoseiw15_mbse_workshop__transformation_of_the_building_industry_final__partick_macleamy_2015_01_24.pdf|*Keynote: Transformation of the Building industry – From Traditional to Digital: Patrick MacLeamy (CEO, HOK and Chair, buildingSMART International)}}
  
  
Line 83: Line 83:
  
 ==== Monday, January 26, 2015 ==== ==== Monday, January 26, 2015 ====
-The following tables include the MBSE activity teams, challenge teams and related working groups (WGs) that are meeting on Monday and/or Tuesday following the above MBSE Workshop on Saturday and Sunday. The MBSE-related POCs are shown here also.  Each POC is responsible for arranging their own meeting rooms, posting their agendas and related contents, and so on.  +The following tables include the MBSE activity teams, challenge teams and related working groups (WGs) that are meeting on Monday and/or Tuesday following the above MBSE Workshop on Saturday and Sunday. The MBSE-related POCs are shown here also.  Each POC is responsible for arranging their own meeting rooms, posting their agendas and related contents, and so on. This approach is similar to what we initiated at [[mbse:​incose_mbse_iw_2014 | IW14]].
  
 As of Jan 24, 2015: The topics shown here are finalized to occur at the dates/times shown. More topics may be added, so check back here for the latest. Please send an email to Russell.Peak - at - gatech.edu to provide any further updates to these tables below. As of Jan 24, 2015: The topics shown here are finalized to occur at the dates/times shown. More topics may be added, so check back here for the latest. Please send an email to Russell.Peak - at - gatech.edu to provide any further updates to these tables below.
Line 94: Line 94:
 | 08:30-17:00 | Ask POC | [[http://​www.incose.org/​practice/​techactivities/​wg/​tii/​ | Tool Integration and Interoperability (TII) WG]] | John Nallon | | 08:30-17:00 | Ask POC | [[http://​www.incose.org/​practice/​techactivities/​wg/​tii/​ | Tool Integration and Interoperability (TII) WG]] | John Nallon |
 | 11:00-12:00 | Ask POC | [[http://​www.incose.org/​practice/​techactivities/​wg/​sswg/​ | Space Systems WG (SSWG)]] - [[mbse:​space | MBSE team]] ​ | Dave Kaslow | | 11:00-12:00 | Ask POC | [[http://​www.incose.org/​practice/​techactivities/​wg/​sswg/​ | Space Systems WG (SSWG)]] - [[mbse:​space | MBSE team]] ​ | Dave Kaslow |
-| 13:00-17:00 | - | BKASE - MBSE | - |+| 13:00-17:00 | - | [[http://​www.bkcase.org/ ​| BKASE]] - MBSE session ​| - |
 | 13:00-15:00 | [[mbse:​patterns:​patterns_challenge_team_mtg_01.26-27.15 | IW15 Update - Agenda]] | [[mbse:​patterns:​patterns | MBSE Pattern-based SE (PBSE) Challenge Team]] | Bill Schindel | | 13:00-15:00 | [[mbse:​patterns:​patterns_challenge_team_mtg_01.26-27.15 | IW15 Update - Agenda]] | [[mbse:​patterns:​patterns | MBSE Pattern-based SE (PBSE) Challenge Team]] | Bill Schindel |
 | 13:30-17:00 | Ask POC | [[http://​www.incose.org/​about/​organization/​ti.aspx | Model-Based Conceptual Design WG]] - [[http://​sesa.org.au/​model-based-conceptual-design-working-group | 13:30-17:00 | Ask POC | [[http://​www.incose.org/​about/​organization/​ti.aspx | Model-Based Conceptual Design WG]] - [[http://​sesa.org.au/​model-based-conceptual-design-working-group
  | (link2)]] | Quoc Do / Kevin Robinson |  | (link2)]] | Quoc Do / Kevin Robinson |
- 
  
 NOTE: Also be aware that more and more MBSE/​SysML-related content is naturally becoming part of the "​traditional"​ existing INCOSE working groups (WGs). For example, the Space Systems WG, the Agile/Lean WG, the Affordability WG, and so on (not all of which are explicitly listed here). Therefore we encourage IW15 attendees to look around for such groups, and/or to join in other groups to collaborate and explore how to benefit from MBSE technology together. NOTE: Also be aware that more and more MBSE/​SysML-related content is naturally becoming part of the "​traditional"​ existing INCOSE working groups (WGs). For example, the Space Systems WG, the Agile/Lean WG, the Affordability WG, and so on (not all of which are explicitly listed here). Therefore we encourage IW15 attendees to look around for such groups, and/or to join in other groups to collaborate and explore how to benefit from MBSE technology together.
mbse/incose_mbse_iw_2015.txt · Last modified: 2015/01/31 10:23 by sfriedenthal