This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
mbse:incose_mbse_iw_2015:breakout_out_session_automotive_modeling [2015/01/24 09:45] george.walley |
mbse:incose_mbse_iw_2015:breakout_out_session_automotive_modeling [2015/01/25 14:13] (current) george.walley |
||
---|---|---|---|
Line 7: | Line 7: | ||
===== Objectives ===== | ===== Objectives ===== | ||
+ | * Foster a discussion among automotive and related teams (e.g. off-highway & commercial vehicles, personal mobility solutions, etc...) specific to our industry | ||
* Learn about and discuss early experiences in deploying and integrating architectural/descriptive modeling with well-established analytical modeling through the Vee | * Learn about and discuss early experiences in deploying and integrating architectural/descriptive modeling with well-established analytical modeling through the Vee | ||
* Facilitate exchange between automotive participants and learn from others who have experienced the same in similar industries | * Facilitate exchange between automotive participants and learn from others who have experienced the same in similar industries | ||
Line 24: | Line 25: | ||
==== Session 1 - Sunday (13:00 - 16:00) ==== | ==== Session 1 - Sunday (13:00 - 16:00) ==== | ||
- | * Introductions & Break-out Goals <<10 min>> | + | * Introductions & Breakout Goals <<10 min>> |
- | * Presentation 1: Starting an Automotive Vision 2025, <<30 min>> | + | * Presentation 1: Manas Bajaj (InterCAX) - {{:mbse:incose_mbse_iw_2015:iw-2015_incose_mbse_workshop_integrating_models_and_apps_across_vee_bajaj_iw.pdf|Integrating Models & Apps Across the Vee for MBSE}} <<20 min>> |
+ | * This presentation will give a sampling of benefits MBSE can provide by establishing the right relationships to enable a multi-vectored traversal of the Systems Vee that adds value to oranizations beyond just a Systems Engineering team. | ||
+ | * Questions / Discussion <<15 min>> | ||
+ | |||
+ | * Presentation 2: Ford Motor Company - Starting an Automotive Vision 2025 <<15 min>> | ||
+ | * This presentation will provide an overview of the plans, timing, and next steps toward tailoring a domain-focused version of the Vision 2025 A World in Motion briefing for automotive. | ||
* Open Discussion Topics: | * Open Discussion Topics: | ||
* Vision 2025 for Automotive: SWOT <<45 min>> | * Vision 2025 for Automotive: SWOT <<45 min>> | ||
+ | * How can an Automotive 2025 Vision effort provide value to your org? | ||
+ | * What would be the most beneficial scope of "Automotive"? (consumer, commercial, agricultural, off-highway, personal mobility) | ||
* Where do we want to be in 10 years? | * Where do we want to be in 10 years? | ||
* What are the gaps to being/getting there? | * What are the gaps to being/getting there? | ||
Line 35: | Line 43: | ||
* Coffee/Restroom Break <<5 min>> | * Coffee/Restroom Break <<5 min>> | ||
- | * Presentation 2: Experiences from Ford <<20 min>> | + | * Presentation 3: George Walley - Experiences from Ford <<20 min>> |
- | * Open Discussion Topics: | + | * This presentation will briefly share some of the experiences, lessons learned, and direction deployment of model-based SE methods and disciplines at Ford. |
- | * How to avoid architectural modeling from being an end of its own? <<25 mins> | + | * Ice-Breaker Discussion Topics: |
- | * Specification Exchange: Models as Specs: <<25 min>> | + | * What will success look like? And (how) can we measure it? |
+ | * How to avoid architectural modeling from being an end of its own? <<15 mins> | ||
+ | * Specification Exchange: Models as Specs: <<15 min>> | ||
* What is the purpose/value proposition? | * What is the purpose/value proposition? | ||
* Internally (i.e. within an OEM, Tier X supplier, etc...) | * Internally (i.e. within an OEM, Tier X supplier, etc...) | ||
* Externally (between OEM <--> Tier X Suppliers) | * Externally (between OEM <--> Tier X Suppliers) | ||
- | * What are the gaps to make this feasible? | + | * What do/would we need to make this feasible? |
* Internally | * Internally | ||
* Externally | * Externally | ||
- | * Out brief preparation <<20 min>> | + | * Out-brief preparation <<20 min>> |
==== ==== | ==== ==== |