User Tools

Site Tools


mbse:mbecm

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
mbse:mbecm [2020/01/23 16:47]
ahoheb [Scope]
mbse:mbecm [2020/01/23 16:48]
ahoheb [Scope]
Line 20: Line 20:
 The INCOSE Challenge Team to develop these as INCOSE products includes development of the Matrix, the associated User's Guide, and a INCOSE Technical Project Plan (TPP). It aligns with the INCOSE 2025 vision and is part of the System Engineering Transformation initiatives. ​ The TPP defines the Challenge Team leadership, how team members are added, as well as the product development and status events. ​ This team has used technical workshops and forums to conduct working sessions to refine the products and uses on-line meetings to status the Challenge Team. The INCOSE Challenge Team to develop these as INCOSE products includes development of the Matrix, the associated User's Guide, and a INCOSE Technical Project Plan (TPP). It aligns with the INCOSE 2025 vision and is part of the System Engineering Transformation initiatives. ​ The TPP defines the Challenge Team leadership, how team members are added, as well as the product development and status events. ​ This team has used technical workshops and forums to conduct working sessions to refine the products and uses on-line meetings to status the Challenge Team.
  
 +Both the excel Matrix and the User's Guide are INCOSE publications and may be downloaded from the Challenge Team working area on INCOSE CONNECT or the INCOSE Store.
  
 ===== Team Members ===== ===== Team Members =====
mbse/mbecm.txt ยท Last modified: 2020/01/23 16:50 by ahoheb