=== Call Notes 24 January 2017 === == Chat Log == Lars Toomre (to Everyone): 1:12 PM: Here is an interesting article about DTCC Credit Derivative DLT Pilot https://medium.com/wsba-perspectives/dtccs-credit-derivatives-dlt-pilot-some-pointers-to-success-c397e9d39359#.7vpnbrl9k Lars Toomre (to Everyone): 1:37 PM: This is link to interest rate swaps in BPMN I think https://www.businessprocessincubator.com/content/smart-contracts-frame-blockchain-discussion/ == IR Swaps Process == Decision: Look to use FIBO foundational concepts for activity and process to define process ontology; can explore later how to extend the concepts to those in BPMN. Meanwhile use this model to integrate process description for IR Swaps with FIBO contractual terms. Noted: the current UML Activity diagram doesn’t deal well with the cycle nature of the events described. Question: where was the more detailed process diagram for IR Swaps? Answer: Mike Bennett (to Everyone): 1:40 PM: 20 Oct email from Pete Rivett Looked at this – this seems to deal with the repeated events in the cycle in a more satisfying way. Use this as the basis for the process ontology. == US Treasuries: == Mike Bennett (to Everyone): 1:48 PM: These are auction process Mike Bennett (to Everyone): 1:49 PM: Usually Primary, sometimes Openings (reissuing under the same CUSIP) Mike Bennett (to Everyone): 1:50 PM: Can we find a process description for Auction? Mike Bennett (to Everyone): 1:50 PM: All to take a look. == AOB == David Saul (to Everyone): 1:52 PM: http://www.coindesk.com/state-streets-blockchain-strategy-big-and-bold-for-2017/ - update on the State Street activity == Actions and Summary == 1 MB: Update the “Webliography” file on the wiki with link to useful sources; Add the various links to articles that have come through on these calls including the above (see also interesting Deutsche Bourse article recently). 2 All: find a source for process description for the Auction process – firstly in its most general form, and then with specifics for US Treasury issuance. 3 MB: Use CCM to model the IR Swaps process, based on the information in the 20 October email from Pete to the group.