This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
sysml-roadmap:chicago_september_2016_meeting_presentations [2016-08-09 07:00] sfriedenthal created |
sysml-roadmap:chicago_september_2016_meeting_presentations [2016-09-19 22:18] (current) sfriedenthal [Presentations] |
||
---|---|---|---|
Line 50: | Line 50: | ||
**Meeting objectives:** | **Meeting objectives:** | ||
- | * Review the System Modeling Environment (SME) Concept Overview, Issues, and Plans | + | * Review draft Service Req’ts & Standard API for the SysML v2 RFP |
- | * Discuss SysML v2 RFP Objectives, Scope, Outline, and Plans | + | * Review draft Req’ts for Properties & Expressions and Interfaces |
+ | * Review/Update Plans for SysML v2 RFP | ||
\\ | \\ | ||
Line 57: | Line 58: | ||
\\ | \\ | ||
**Tuesday, September 13, 2016** | **Tuesday, September 13, 2016** | ||
- | * 13:00 - 13:15 Introduction - Sandy Friedenthal | + | * 13:00 - 13:45 Introduction & Orlando Meeting Summary - Sandy Friedenthal |
- | * 13:15 - 14:30 SME Concept Overview - Sandy Friedenthal | + | * 13:45 - 14:30 SME Concept Updates - All |
* 14:30 - 15:00 Break | * 14:30 - 15:00 Break | ||
- | * 15:00 - 16:00 MBE Change Scenario / Demo - C Muggeo, M Pfenning, P Chadzynski | + | * 15:00 - 16:45 Service Requirements and Standard API - Axel Reichwein |
- | * 16:00 - 16:30 Modeling Formalism - Jonathan Patrick | + | * 16:45 - 17:00 Safety Profile RFP Update - Geoffrey Biggs |
- | * 16:30 - 17:00 Analysis Concept - Manas Bajaj | + | |
- | * 17:00 - 17:30 MBEE and an Executable SE Method - Robert Karban | + | |
\\ | \\ | ||
**Thursday, September 15, 2016** | **Thursday, September 15, 2016** | ||
- | * 09:00 - 09:30 Model Management - Laura Hart | + | * 09:00 - 09:30 Systems Engineering Concept Model (SECM) Status Update - John Watson |
- | * 09:30 - 10:00 Model Visualization - Josh Feingold, Marc Sarrel | + | * 09:30 - 10:30 Draft RFP Requirements for Properties and Expressions - Hans Peter deKoning |
- | * 10:00 - 10:30 Break | + | * 10:30 - 11:00 Break |
- | * 10:30 - 11:00 Systems Engineering Concept Model (SECM) - John Watson, Sandy F, Marc Sarrel | + | * 11:00 - 12:00 Draft RFP Requirements for Interfaces - Marc Sarrel |
- | * 11:00 - 12:00 Draft RFP Requirements for Properties and Expressions - Hans Peter deKoning | + | |
* 12:00 - 13:00 Lunch | * 12:00 - 13:00 Lunch | ||
- | * 13:00 - 13:30 Model Construction - Ron Williamson | + | * 13:00 - 13:30 Formalism Requirements - Jonathan Patrick |
- | * 13:30 - 14:30 Service Requirements and the Standard API - Axel Reichwein ? | + | * 13:30 - 14:30 SysML v2 Requirements (Other) - Concept Leads/All |
- | * 14:15 - 14:30 Workflow and Collaboration - Hedley Apperly (Deferred) | + | |
* 14:30 - 15:00 Break | * 14:30 - 15:00 Break | ||
- | * 15:00 - 15:30 SysML v2 RFP Considerations from Reston - Sandy/All | + | * 15:00 - 16:00 SysML v2 RFP Planning (Outline, Responsibilities, Milestones) - Sandy/All |
- | * 15:30 - 17:00 SysML v2 RFP Objectives, Scope, and Outline - Sandy/All | + | |
- | * 16:30 - 17:00 Next Steps - All | + | |
\\ | \\ | ||
- | Each Concept Lead had approximately 30 minutes to present any significant updates to their concept, identify open issues, and their plans to address the open issues and items below: | ||
- | * Follow-up on actions from the Reston WG meeting (refer to meeting summary on [[http://www.omgwiki.org/OMGSysML/doku.php?id=sysml-roadmap:reston_mar_2016_meeting_presentations| Reston Meeting Wiki]]) | ||
- | * Effectiveness measures and driving requirements | ||
- | * Limitations of current SysML | ||
- | * Key features and graphic of their concept | ||
- | * Service requirements (e.g. functions) | ||
- | * Illustration of how their concepts supports the Hybrid SUV scenario | ||
- | * Plans for prototypes to demonstrate feasibility | ||
- | * Wiki status | ||
+ | ====== Presentations ====== | ||
+ | * {{ :sysml-roadmap:01_sysml_v2-meeting_summary-chicago-friedenthal-2016-09-13-15-a.docx |SysML v2 RFP WG Meeting Summary-Chicago-Sept 2016-friedenthal}} | ||
+ | * {{ :sysml-roadmap:02-sysml_2_analysis_wg_2016-09-13.pdf |Model Analysis Concept Update -Chicago-Sept 2016-Bajaj}} | ||
+ | * {{ :sysml-roadmap:03-sysml_v2_interoperability_requirements_-_september_13_2016.pdf |Interoperability Concept Update-Sept 2016-reichwein}} | ||
+ | * {{ :sysml-roadmap:04-secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_as....pptx |Systems Engineering Concept Model-SECM- Update-Chicago-Sept 2016-watson}} | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | ====== Presentations ====== | ||
- | * {{sysml-roadmap:00_sysml_v2-meeting_summary-chicago-friedenthal-2016-09-13-15.docx|Meeting_Summary_Chicago-friedenthal-2016-09-13-15}} | ||
- |