User Tools

Site Tools


sysml-roadmap:systems_engineering_concept_model_workgroup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
sysml-roadmap:systems_engineering_concept_model_workgroup [2016-12-07 18:43]
jwatson
sysml-roadmap:systems_engineering_concept_model_workgroup [2017-04-21 18:49]
jwatson [SysML v2 RFP Material]
Line 1: Line 1:
-Back to [[http://​www.omgwiki.org/​OMGSysML/​doku.php?​id=sysml-roadmap:​sysml_assessment_and_roadmap_working_group| ​System Modeling Assessment and Roadmap ​Working Group]]+Back to [[http://​www.omgwiki.org/​OMGSysML/​doku.php?​id=sysml-roadmap:​sysml_assessment_and_roadmap_working_group| ​SysML v2 RFP Working Group]]
  
  
Line 112: Line 112:
 ===== The Approach of the SECM Working Group===== ===== The Approach of the SECM Working Group=====
  
-{{  sysml-roadmap:​secm_approach_14.jpg ?600  ​|}}+{{sysml-roadmap:​secm_approach_14.jpg ?400|}}
   - A goal of this group will be to capture the Systems Engineering Concept Model (SECM)- 2015 Industry Reference. ​   - A goal of this group will be to capture the Systems Engineering Concept Model (SECM)- 2015 Industry Reference. ​
     - The intent of this model is to capture Systems Engineering domain concepts based on well established industry references. The SEBoK V0.5 Model was created in 2011 and provided a model similar to the SECM- 2015 Industry Reference. It was based on a pre-released version of the SEBoK. It will be used as a "look and feel" reference. ​ The three primary industry references used as source material include;     - The intent of this model is to capture Systems Engineering domain concepts based on well established industry references. The SEBoK V0.5 Model was created in 2011 and provided a model similar to the SECM- 2015 Industry Reference. It was based on a pre-released version of the SEBoK. It will be used as a "look and feel" reference. ​ The three primary industry references used as source material include;
Line 160: Line 160:
  
 [[Property Modeling Core Team|Link to "​Property & Expression Modeling Focus Team" Wiki Page]] [[Property Modeling Core Team|Link to "​Property & Expression Modeling Focus Team" Wiki Page]]
- 
-=== SE Needs Reference Material === 
-  * {{sysml-roadmap:​secm_-_property_thoughts_r5.docx|Property Thoughts R5}} 
-  * {{sysml-roadmap:​sysml_v2_rfp_properties_comments_b4_20151207.xlsx|Property Comment Spreadsheet}} 
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
Line 176: Line 172:
 [[Interface Concepts Modeling Core Team| Link to "​Interface Concepts Modeling Focus Team" Wiki Page]] [[Interface Concepts Modeling Core Team| Link to "​Interface Concepts Modeling Focus Team" Wiki Page]]
  
- 
-=== SE Needs Reference Material === 
-  * {{sysml-roadmap:​interface_needs_r7.docx|Interface Needs Document 6 June 2016}} 
-  * {{sysml-roadmap:​interface_needs_review_slides_6-7-2016.pptx|Interface Needs Model Diagrams Review 7 June2016}} 
-  * {{sysml-roadmap:​ecss-e-st-10-24c_1june2015_.pdf|Space engineering Interface management, ECSS-E-ST-10-24C,​1 June 2015}} 
-  * "A Representative Application of a Layered Interface Modeling Pattern";​ P. Shames, M. Sarrel, S. Friedenthal;​ JPL, California Institute of Technology (Link to be provided when published) 
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
Line 188: Line 178:
 [[Requirement Concepts Modeling Core Team| Link to "​Requirement and Verification Concepts Modeling Focus Team" Wiki Page ]] [[Requirement Concepts Modeling Core Team| Link to "​Requirement and Verification Concepts Modeling Focus Team" Wiki Page ]]
  
-=== SE Needs Reference Material === 
- 
-  * Go to "​Requirement and Verification Concepts Modeling Focus Team" Wiki Page under the heading "​Starting Point" 
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
Line 196: Line 183:
  
  
-==== 4.   ​Structure/​Behavior ​Concepts Modeling Focus Team ====+==== 4.   ​Structure Concepts Modeling Focus Team ====
  
-[[Structure/​Behavior Concepts Modeling Core Team Wiki Page |Link to "​Structure/​Behavior ​Concepts Modeling Focus Team" Wiki Page ]]+[[Structure/​Behavior Concepts Modeling Core Team Wiki Page |Link to "​Structure Concepts Modeling Focus Team" Wiki Page ]]
  
 === SE Needs Reference Material === === SE Needs Reference Material ===
Line 213: Line 200:
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
 +
 +==== 6.   ​Behavior Concepts Modeling Focus Team ====
 +
 +[[Behavior Concepts Modeling Core Team |Link to "​Behavior Modeling Focus Team" Wiki Page ]]
 +
 +
 +=== SE Needs Reference Material ===
 +
 +
 +=====   ​------------------------------ ​  =====
 +
  
 ==== X.   ​Template for Next Concepts Modeling Focus Team ==== ==== X.   ​Template for Next Concepts Modeling Focus Team ====
Line 226: Line 224:
  
 ===== SysML v2 RFP Material ===== ===== SysML v2 RFP Material =====
 +  * {{ :​sysml-roadmap:​secm_work_area_guidelines_21_apr_2017.pdf |SECM Work Area Guidelines, 21 Apr 2017}}
 +  * {{ :​sysml-roadmap:​sysml_v2_rfp_reqts_examples.xlsx |SysML v2 RFP Requirement Examples, 21 Apr 2017}}
 +  * {{ :​sysml-roadmap:​sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}}
   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}
   * {{ :​sysml-roadmap:​api_requirements_07_dec_2016.xlsx |API Requirements 07 Dec 2016}}   * {{ :​sysml-roadmap:​api_requirements_07_dec_2016.xlsx |API Requirements 07 Dec 2016}}
Line 261: Line 262:
   * {{sysml-roadmap:​secm_status_06-23-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx|SECM Status, OMG Tech Meeting, Orlando FL, Systems Modeling Roadmap and Assessment Mtg 06-23-2016}}   * {{sysml-roadmap:​secm_status_06-23-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx|SECM Status, OMG Tech Meeting, Orlando FL, Systems Modeling Roadmap and Assessment Mtg 06-23-2016}}
   * {{ :​sysml-roadmap:​secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}}   * {{ :​sysml-roadmap:​secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}}
 +  * {{ :​sysml-roadmap:​secm_status-omg_tech_meeting_coronado_ca_sysml_v2_rfp_working_group_meeting-12-08-16.pptx |SECM Status, OMG Tech Meeting Coronado CA, SysML v2 RFP Working Group Meeting, 12-08-2016}} 
 +  * {{ :​sysml-roadmap:​secm_model-based_specification_approach_r2_-_omg_mtg_reston_va_21_mar_2017.pptx |SECM, RFP Model Based Specification Approach, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-21-2017}} 
 +  * {{ :​sysml-roadmap:​secm_status_03-22-2017_omg_tech_meeting_sysml_v2_rfp_working_group_mtg_reston_va_-_watson.pptx |SECM Status, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-22-2017}}
 ==  == ==  ==
 ==  == ==  ==
sysml-roadmap/systems_engineering_concept_model_workgroup.txt · Last modified: 2017-09-17 12:18 by jwatson