User Tools

Site Tools


sysml-roadmap:systems_engineering_concept_model_workgroup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
sysml-roadmap:systems_engineering_concept_model_workgroup [2017-03-22 18:45]
jwatson [4. Structure Concepts Modeling Focus Team]
sysml-roadmap:systems_engineering_concept_model_workgroup [2017-09-17 12:18]
jwatson [The SECM Working Group Team]
Line 12: Line 12:
 | Rick Steiner | Skygazer Consulting | <​[email protected]>​ | | Rick Steiner | Skygazer Consulting | <​[email protected]>​ |
 | John Watson (Lead)| Lockheed Martin - Retired | <​[email protected]>​ | | John Watson (Lead)| Lockheed Martin - Retired | <​[email protected]>​ |
 +
 +===== SysML v2 RFP - Extracted SECM Documents =====
 +  * {{ :​sysml-roadmap:​sysml_v2_reqt_support_doc_16_sept_2017_validation_8.docx |SysML v2 Requirement Support Document, PRELIMINARY v8, 16 Sept 2017 }}
 +
 +
  
  
Line 201: Line 206:
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
  
-==== X.   ​Behavior Concepts Modeling Focus Team ====+==== 6.   ​Behavior Concepts Modeling Focus Team ==== 
 + 
 +[[Behavior Concepts Modeling Core Team |Link to "​Behavior Modeling Focus Team" Wiki Page ]]
  
-[[Template for Next Concepts Modeling Core Team |Link to "Next Concepts Modeling Focus Team" Wiki Page ]] 
  
 === SE Needs Reference Material === === SE Needs Reference Material ===
Line 223: Line 229:
  
 ===== SysML v2 RFP Material ===== ===== SysML v2 RFP Material =====
 +  * {{ :​sysml-roadmap:​secm_work_area_guidelines_21_apr_2017.pdf |SECM Work Area Guidelines, 21 Apr 2017}}
 +  * {{ :​sysml-roadmap:​sysml_v2_rfp_reqts_examples.xlsx |SysML v2 RFP Requirement Examples, 21 Apr 2017}}
   * {{ :​sysml-roadmap:​sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}}   * {{ :​sysml-roadmap:​sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}}
   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}
Line 260: Line 268:
   * {{ :​sysml-roadmap:​secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}}   * {{ :​sysml-roadmap:​secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}}
   * {{ :​sysml-roadmap:​secm_status-omg_tech_meeting_coronado_ca_sysml_v2_rfp_working_group_meeting-12-08-16.pptx |SECM Status, OMG Tech Meeting Coronado CA, SysML v2 RFP Working Group Meeting, 12-08-2016}}   * {{ :​sysml-roadmap:​secm_status-omg_tech_meeting_coronado_ca_sysml_v2_rfp_working_group_meeting-12-08-16.pptx |SECM Status, OMG Tech Meeting Coronado CA, SysML v2 RFP Working Group Meeting, 12-08-2016}}
 +  * {{ :​sysml-roadmap:​secm_model-based_specification_approach_r2_-_omg_mtg_reston_va_21_mar_2017.pptx |SECM, RFP Model Based Specification Approach, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-21-2017}}
 +  * {{ :​sysml-roadmap:​secm_status_03-22-2017_omg_tech_meeting_sysml_v2_rfp_working_group_mtg_reston_va_-_watson.pptx |SECM Status, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-22-2017}}
 ==  == ==  ==
 ==  == ==  ==
sysml-roadmap/systems_engineering_concept_model_workgroup.txt · Last modified: 2017-09-17 12:18 by jwatson