User Tools

Site Tools


sysml-roadmap:systems_engineering_concept_model_workgroup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
sysml-roadmap:systems_engineering_concept_model_workgroup [2017-03-22 19:12]
jwatson [Presentations]
sysml-roadmap:systems_engineering_concept_model_workgroup [2017-09-17 12:18] (current)
jwatson [The SECM Working Group Team]
Line 12: Line 12:
 | Rick Steiner | Skygazer Consulting | <​[email protected]>​ | | Rick Steiner | Skygazer Consulting | <​[email protected]>​ |
 | John Watson (Lead)| Lockheed Martin - Retired | <​[email protected]>​ | | John Watson (Lead)| Lockheed Martin - Retired | <​[email protected]>​ |
 +
 +===== SysML v2 RFP - Extracted SECM Documents =====
 +  * {{ :​sysml-roadmap:​sysml_v2_reqt_support_doc_16_sept_2017_validation_8.docx |SysML v2 Requirement Support Document, PRELIMINARY v8, 16 Sept 2017 }}
 +
 +
  
  
Line 224: Line 229:
  
 ===== SysML v2 RFP Material ===== ===== SysML v2 RFP Material =====
 +  * {{ :​sysml-roadmap:​secm_work_area_guidelines_21_apr_2017.pdf |SECM Work Area Guidelines, 21 Apr 2017}}
 +  * {{ :​sysml-roadmap:​sysml_v2_rfp_reqts_examples.xlsx |SysML v2 RFP Requirement Examples, 21 Apr 2017}}
   * {{ :​sysml-roadmap:​sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}}   * {{ :​sysml-roadmap:​sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}}
   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}
sysml-roadmap/systems_engineering_concept_model_workgroup.1490224332.txt.gz ยท Last modified: 2017-03-22 19:12 by jwatson