This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
sysml-roadmap:systems_engineering_concept_model_workgroup [2016-12-07 18:43] jwatson |
sysml-roadmap:systems_engineering_concept_model_workgroup [2017-09-17 12:18] (current) jwatson [The SECM Working Group Team] |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | Back to [[http://www.omgwiki.org/OMGSysML/doku.php?id=sysml-roadmap:sysml_assessment_and_roadmap_working_group| System Modeling Assessment and Roadmap Working Group]] | + | Back to [[http://www.omgwiki.org/OMGSysML/doku.php?id=sysml-roadmap:sysml_assessment_and_roadmap_working_group| SysML v2 RFP Working Group]] |
Line 12: | Line 12: | ||
| Rick Steiner | Skygazer Consulting | <[email protected]> | | | Rick Steiner | Skygazer Consulting | <[email protected]> | | ||
| John Watson (Lead)| Lockheed Martin - Retired | <[email protected]> | | | John Watson (Lead)| Lockheed Martin - Retired | <[email protected]> | | ||
+ | |||
+ | ===== SysML v2 RFP - Extracted SECM Documents ===== | ||
+ | * {{ :sysml-roadmap:sysml_v2_reqt_support_doc_16_sept_2017_validation_8.docx |SysML v2 Requirement Support Document, PRELIMINARY v8, 16 Sept 2017 }} | ||
+ | |||
+ | |||
Line 112: | Line 117: | ||
===== The Approach of the SECM Working Group===== | ===== The Approach of the SECM Working Group===== | ||
- | {{ sysml-roadmap:secm_approach_14.jpg ?600 |}} | + | {{sysml-roadmap:secm_approach_14.jpg ?400|}} |
- A goal of this group will be to capture the Systems Engineering Concept Model (SECM)- 2015 Industry Reference. | - A goal of this group will be to capture the Systems Engineering Concept Model (SECM)- 2015 Industry Reference. | ||
- The intent of this model is to capture Systems Engineering domain concepts based on well established industry references. The SEBoK V0.5 Model was created in 2011 and provided a model similar to the SECM- 2015 Industry Reference. It was based on a pre-released version of the SEBoK. It will be used as a "look and feel" reference. The three primary industry references used as source material include; | - The intent of this model is to capture Systems Engineering domain concepts based on well established industry references. The SEBoK V0.5 Model was created in 2011 and provided a model similar to the SECM- 2015 Industry Reference. It was based on a pre-released version of the SEBoK. It will be used as a "look and feel" reference. The three primary industry references used as source material include; | ||
Line 160: | Line 165: | ||
[[Property Modeling Core Team|Link to "Property & Expression Modeling Focus Team" Wiki Page]] | [[Property Modeling Core Team|Link to "Property & Expression Modeling Focus Team" Wiki Page]] | ||
- | |||
- | === SE Needs Reference Material === | ||
- | * {{sysml-roadmap:secm_-_property_thoughts_r5.docx|Property Thoughts R5}} | ||
- | * {{sysml-roadmap:sysml_v2_rfp_properties_comments_b4_20151207.xlsx|Property Comment Spreadsheet}} | ||
===== ------------------------------ ===== | ===== ------------------------------ ===== | ||
Line 176: | Line 177: | ||
[[Interface Concepts Modeling Core Team| Link to "Interface Concepts Modeling Focus Team" Wiki Page]] | [[Interface Concepts Modeling Core Team| Link to "Interface Concepts Modeling Focus Team" Wiki Page]] | ||
- | |||
- | === SE Needs Reference Material === | ||
- | * {{sysml-roadmap:interface_needs_r7.docx|Interface Needs Document 6 June 2016}} | ||
- | * {{sysml-roadmap:interface_needs_review_slides_6-7-2016.pptx|Interface Needs Model Diagrams Review 7 June2016}} | ||
- | * {{sysml-roadmap:ecss-e-st-10-24c_1june2015_.pdf|Space engineering Interface management, ECSS-E-ST-10-24C,1 June 2015}} | ||
- | * "A Representative Application of a Layered Interface Modeling Pattern"; P. Shames, M. Sarrel, S. Friedenthal; JPL, California Institute of Technology (Link to be provided when published) | ||
===== ------------------------------ ===== | ===== ------------------------------ ===== | ||
Line 188: | Line 183: | ||
[[Requirement Concepts Modeling Core Team| Link to "Requirement and Verification Concepts Modeling Focus Team" Wiki Page ]] | [[Requirement Concepts Modeling Core Team| Link to "Requirement and Verification Concepts Modeling Focus Team" Wiki Page ]] | ||
- | === SE Needs Reference Material === | ||
- | |||
- | * Go to "Requirement and Verification Concepts Modeling Focus Team" Wiki Page under the heading "Starting Point" | ||
===== ------------------------------ ===== | ===== ------------------------------ ===== | ||
Line 196: | Line 188: | ||
- | ==== 4. Structure/Behavior Concepts Modeling Focus Team ==== | + | ==== 4. Structure Concepts Modeling Focus Team ==== |
- | [[Structure/Behavior Concepts Modeling Core Team Wiki Page |Link to "Structure/Behavior Concepts Modeling Focus Team" Wiki Page ]] | + | [[Structure/Behavior Concepts Modeling Core Team Wiki Page |Link to "Structure Concepts Modeling Focus Team" Wiki Page ]] |
=== SE Needs Reference Material === | === SE Needs Reference Material === | ||
Line 213: | Line 205: | ||
===== ------------------------------ ===== | ===== ------------------------------ ===== | ||
+ | |||
+ | ==== 6. Behavior Concepts Modeling Focus Team ==== | ||
+ | |||
+ | [[Behavior Concepts Modeling Core Team |Link to "Behavior Modeling Focus Team" Wiki Page ]] | ||
+ | |||
+ | |||
+ | === SE Needs Reference Material === | ||
+ | |||
+ | |||
+ | ===== ------------------------------ ===== | ||
+ | |||
==== X. Template for Next Concepts Modeling Focus Team ==== | ==== X. Template for Next Concepts Modeling Focus Team ==== | ||
Line 226: | Line 229: | ||
===== SysML v2 RFP Material ===== | ===== SysML v2 RFP Material ===== | ||
+ | * {{ :sysml-roadmap:secm_work_area_guidelines_21_apr_2017.pdf |SECM Work Area Guidelines, 21 Apr 2017}} | ||
+ | * {{ :sysml-roadmap:sysml_v2_rfp_reqts_examples.xlsx |SysML v2 RFP Requirement Examples, 21 Apr 2017}} | ||
+ | * {{ :sysml-roadmap:sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}} | ||
* {{ :sysml-roadmap:sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}} | * {{ :sysml-roadmap:sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}} | ||
* {{ :sysml-roadmap:api_requirements_07_dec_2016.xlsx |API Requirements 07 Dec 2016}} | * {{ :sysml-roadmap:api_requirements_07_dec_2016.xlsx |API Requirements 07 Dec 2016}} | ||
Line 261: | Line 267: | ||
* {{sysml-roadmap:secm_status_06-23-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx|SECM Status, OMG Tech Meeting, Orlando FL, Systems Modeling Roadmap and Assessment Mtg 06-23-2016}} | * {{sysml-roadmap:secm_status_06-23-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx|SECM Status, OMG Tech Meeting, Orlando FL, Systems Modeling Roadmap and Assessment Mtg 06-23-2016}} | ||
* {{ :sysml-roadmap:secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}} | * {{ :sysml-roadmap:secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}} | ||
+ | * {{ :sysml-roadmap:secm_status-omg_tech_meeting_coronado_ca_sysml_v2_rfp_working_group_meeting-12-08-16.pptx |SECM Status, OMG Tech Meeting Coronado CA, SysML v2 RFP Working Group Meeting, 12-08-2016}} | ||
+ | * {{ :sysml-roadmap:secm_model-based_specification_approach_r2_-_omg_mtg_reston_va_21_mar_2017.pptx |SECM, RFP Model Based Specification Approach, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-21-2017}} | ||
+ | * {{ :sysml-roadmap:secm_status_03-22-2017_omg_tech_meeting_sysml_v2_rfp_working_group_mtg_reston_va_-_watson.pptx |SECM Status, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-22-2017}} | ||
== == | == == | ||
== == | == == |