This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
miwginternal [2015/09/16 10:59] edseidewitz Changed repository URLs to point to OMG SVN |
miwginternal [2015/09/16 11:03] edseidewitz Updated for Release 15. |
||
---|---|---|---|
Line 6: | Line 6: | ||
* We have an email exploder. To join, send a request to <[email protected]>. | * We have an email exploder. To join, send a request to <[email protected]>. | ||
- | * We have regular telecons every Monday morning at 10:00 AM Eastern Time. | + | * The UML MIWG is part of the Model Interchange SIG, which traditional meets on Monday morning during OMG meeting weeks. |
+ | * We are not having regular telecons at this time. | ||
- | Release 13 has now been made public as the current MIWG test suite. | + | Release 15 has now been made public as the current MIWG test suite. |
- | + | ||
- | Test cases for Release 14 are currently being finalized on the trunk in the internal MIWG repository. | + | |
Line 26: | Line 25: | ||
* [[http://www.eclipse.org/modeling/mdt/uml2/docs/guides/UML2_3.0_Migration_Guide/guide.html|UML 2.1.2 to UML 2.2 Migration Guide (from Eclipse UML Project)]] | * [[http://www.eclipse.org/modeling/mdt/uml2/docs/guides/UML2_3.0_Migration_Guide/guide.html|UML 2.1.2 to UML 2.2 Migration Guide (from Eclipse UML Project)]] | ||
* [[XSLT_Scripts|Some useful XSLT scripts]] | * [[XSLT_Scripts|Some useful XSLT scripts]] | ||
+ | * {{MIWG-roadmap-120116-reva-draft-sf.ppt|Old Roadmap}} | ||
* [[Testcase Authoring HowTo 101]] (TBD - advice for the forgetful staff of Vendor companies on how to design a diagram-centric testcase) | * [[Testcase Authoring HowTo 101]] (TBD - advice for the forgetful staff of Vendor companies on how to design a diagram-centric testcase) |