This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
mbse:patterns:mbse_patterns_wg_participation_in_incose_is2022 [2022/06/25 10:05] schindel |
mbse:patterns:mbse_patterns_wg_participation_in_incose_is2022 [2022/06/25 13:13] (current) schindel |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ** MBSE Patterns Working Group Participation in INCOSE IS2022 ** | ** MBSE Patterns Working Group Participation in INCOSE IS2022 ** | ||
| + | |||
| + | Working Group June 26 Meeting Slides: | ||
| - | {{ :mbse:patterns:mbse_patterns_wg_mtg_is2022_06.26.2022_v1.3.4_.pdf |}} | + | {{ :mbse:patterns:mbse_patterns_wg_mtg_is2022_06.26.2022_v1.3.5_.pdf |}} |
| + | |||
| + | ST4SE Project Report "Pink Team Review" Draft: | ||
| + | |||
| + | {{ :mbse:patterns:incose_patterns_wg_report--st4se_project--pink_team_review_draft_v1.9.1.pdf |}} | ||
| + | |||
| + | IS2022 June 29 Afternoon Paper Session: | ||
| {{ :mbse:patterns:realizing_the_vision_of_digital_engineering_is2022_v1.3.4.pdf |}} | {{ :mbse:patterns:realizing_the_vision_of_digital_engineering_is2022_v1.3.4.pdf |}} | ||
| - | {{ :mbse:patterns:mbse_patterns_wg_mtg_is2022_06.26.2022_v1.3.1_.pdf |}} | + | {{ :mbse:patterns:incose_is2022_realizing_the_promise_of_digital_engineering_v1.1.3.pdf |}} |