Table of Contents

Production and Logistics Systems Modeling Challenge Team

Purpose

The production and logistics modeling team is advancing the practice and adoption of formal system modeling and model-based systems engineering methodologies in production and logistics systems development and operations. Specific challenges in providing a foundation to production and logistics [systems] engineering are the lack of:

The purpose of this challenge team is to increase the availability of reference models, awareness of these models and methods, and successful use of MBSE in the production, logistics, and industrial engineering communities.

Scope

The systems of interest are discrete event logistics systems (DELS). They can be described as:

These systems include, but are not limited to:

The adjective “discrete” recognizes the nature of the products, flows, and processes. Products are discrete units, e.g., individual product units or components of product units, or batches of product units, flowing through the network separately. Processes have well-defined start and end times, e.g., the start of a machining or heat-treating process and completion of same, even though our knowledge of the well-defined time may be uncertain.

The scope of team activities is broad, covering almost all aspects of DELS. It might be narrowed and/or broken into smaller projects and outcomes based on the interest of team members. The scope can be defined along three axes:

Measure of Success

General measures of success of this working group include the number of members, joint activity partners, and activities successfully completed over the long term (years). The activities will be determined by our target stakeholders:

Plan Overview / Description

Phase 1: (Time period to be established)

Schedule

DateMilestoneStatusPoint of ContactMaterials
2017-01 Initial presentation at IW17 (Torrance, CA) completed Timothy Sprock Presentation
2018-01 Status presentation & Team Meeting at IW18 (Jacksonville, FL) completed Timothy Sprock Presentation
2019-01 Status presentation & Team Meeting at IW19 (Torrance, CA) completed Timothy Sprock Presentation
2020-01 Status presentation & Team Meeting at IW20 (Torrance, CA) completed Timothy Sprock Presentation
2021-01 Status presentation & Team Meeting at IW21 (Virtual) completed Leon McGinnis Presentation

Challenge team weekly meeting at 11 am (Eastern) Fridays. To join the Meeting: https://bluejeans.com/419553114

Team Members

Challenge Team Lead / POC: Tim Sprock, NIST: [email protected]

Co-Lead: Leon McGinnis, Georgia Tech

Co-Lead: Conrad Bock, NIST