User Tools

Site Tools


mbse:incose_mbse_iw_2013

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
mbse:incose_mbse_iw_2013 [2013/01/28 23:00]
sfriedenthal
mbse:incose_mbse_iw_2013 [2013/02/15 16:26] (current)
bjorncole
Line 25: Line 25:
 |10:​00-10:​15 ​ | {{:​mbse:​01-2013_incose_mbse_workshop-introduction-friedenthal-sampson.ppt|Introduction}} |  |10:​00-10:​15 ​ | {{:​mbse:​01-2013_incose_mbse_workshop-introduction-friedenthal-sampson.ppt|Introduction}} | 
 |10:​15-11:​15 ​ | {{:​mbse:​02-2013_incose_mbse_workshop-i_ve_modeled_so_what_s_next-oster.pdf|I’ve Modeled… So What’s Next? – Chris Oster}} | |10:​15-11:​15 ​ | {{:​mbse:​02-2013_incose_mbse_workshop-i_ve_modeled_so_what_s_next-oster.pdf|I’ve Modeled… So What’s Next? – Chris Oster}} |
-|11:​15-12:​00 ​ | {{:mbse:03-2013_incose_mbse_workshop_2013-ford_automotive_complexity_v3.2-davey.pptx|Systems and Software Modeling at Ford - Chris Davey}} |+|11:​15-12:​00 ​ | {{:mbse:03-2013_incose_mbse_workshop-ford_automotive_complexity_v4.0-davey.pdf|Systems and Software Modeling at Ford - Chris Davey}} |
 |12:​00-13:​00 ​ | Lunch | |12:​00-13:​00 ​ | Lunch |
 |13:​00-14:​00 ​ | {{:​mbse:​04-2013_incose_mbse_workshop-cubesat_model_challenge_team_v2-anderson.pptx|Cubesat Model Demonstration – Louise Anderson and Team}} | |13:​00-14:​00 ​ | {{:​mbse:​04-2013_incose_mbse_workshop-cubesat_model_challenge_team_v2-anderson.pptx|Cubesat Model Demonstration – Louise Anderson and Team}} |
 |14:​00-15:​00 ​ | {{:​mbse:​05a-2013_incose_mbse_workshop-slim_for_mbse-bajaj-01.pptx|SLIM : Integrating MBSE and Product Lifecycle Management (PLM) - Manas Bajaj}} ​ | |14:​00-15:​00 ​ | {{:​mbse:​05a-2013_incose_mbse_workshop-slim_for_mbse-bajaj-01.pptx|SLIM : Integrating MBSE and Product Lifecycle Management (PLM) - Manas Bajaj}} ​ |
 |15:​00-15:​30 ​ | Break | |15:​00-15:​30 ​ | Break |
-|15:​30-17:​00 ​ | Parallel Breakouts *|+|15:​30-17:​00 ​ | Parallel Breakouts ​(refer to site pages for individual breakouts below)|
  
 ==== Sunday, January 27, 2013 ==== ==== Sunday, January 27, 2013 ====
 ^Time^Topic^ ^Time^Topic^
-| 08:30-09:30 | System Architecture Virtual Integration (SAVI) – Dr Don Ward | +| 08:​30-09:​30 ​| {{:​mbse:​06-2013_incose_mbse_workshop-savi-ward.pptx|System Architecture Virtual Integration (SAVI) – Dr Don Ward}} 
-| 09:30-10:30 | Multi-Domain ​Modeling  ​– Hans Peter de Koning |+| 09:​30-10:​30 ​| {{:​mbse:​07b-2013_incose_mbse_workshop-multi-domain_model-based_engineering--dekoning.pptx|Multi-Domain ​Model-Based Engineering ​– Hans Peter de Koning}} |
 | 10:30-11:00 | Break | | 10:30-11:00 | Break |
-| 11:00-12:00 | Model Transformations - Chris Paredis|+| 11:​00-12:​00 ​| {{:​mbse:​08-2013_incose_mbse_workshop-modeltransformation-paredis_20130126.pptx|Model Transformations - Chris Paredis}} |
 | 12:00-13:00 | Lunch | | 12:00-13:00 | Lunch |
-| 13:00-13:30 | MBSE Adoption Experiences at JPL – Bjorn Cole |  +| 13:​00-13:​30 ​| {{:​mbse:​09-2013_incose_mbse_workshop-jplexperience-cole_20130126.ppt|MBSE Adoption Experiences at JPL – Bjorn Cole}} 
-| 13:30-13:45 | Model-Based Conceptual Design Working Group - Quoc Do  | +| 13:​30-13:​45 ​| {{:​mbse:​10-2013_incose_mbse_workshop-model-based_conceptual_design_mbcd_wg_introduction_final-quoc_do.pptx|Model-Based Conceptual Design Working Group - Quoc Do}}  ​| ​
 | 13:45-14:00 | Break | | 13:45-14:00 | Break |
-| 14:00-15:30 | Parallel Breakouts * (cont.)| +| 14:00-15:30 | Parallel Breakouts ​(refer to site pages for individual breakouts below)| 
-| 15:30-16:45 | Breakout Out-briefs (15 minutes each) | +| 15:30-16:45 | Breakout Out-briefs (* refer to site pages for individual breakouts below)| 
-| 16:15-17:00 | Wrap-up |+| 16:​15-17:​00 ​| {{:​mbse:​11-2013_incose_mbse_workshop-wrap_up-friedenthal-sampson.ppt|Wrap-up}} |
  
  
mbse/incose_mbse_iw_2013.1359432007.txt.gz · Last modified: 2013/01/28 23:00 by sfriedenthal