This is an old revision of the document!
Back to SysML v2 RFP Working Group
Reston Meeting - March 2017
SysML v2 RFP Working Group Meeting
Meeting Overview
The following summarizes the objectives and agenda for the SysML v2 RFP WG meeting in Reston, Virginia on March 21-23, 2017. The meeting summary and other presentations will be included in the presentation section below.
Meeting objectives:
Meeting agenda:
Tuesday, March 21, 2017
09:00 - 10:15 Usability req’ts working session - S. Friedenthal, B Muth, T Ngoon
10:15 - 10:45 Break
10:45 - 12:00 Usability req’ts working session (cont) - Open Discussion
12:00 - 13:00 Lunch
13:00 - 13:30 Meeting Overview - S Friedenthal
13:30 - 14:15 Model-based specification approach - J Watson/R Karban
14:15 - 14:45 Break
14:45 - 15:00 Declarative Specification Approach - Keith Butler
15:00 - 15:45 Formalism requirements and alternative approaches - J Patrick
15:45 - 17:00 Prototype
API presentation and demonstration – M Bajaj
Wednesday, March 22, 2017
09:30 - 10:30 Draft service requirements - Concept Leads
10:30 - 11:00 Break
11:00 - 12:00 Draft service requirements (cont.) - Concept Leads
12:00 - 13:30 Lunch
13:30 - 14:00 Concrete Syntax Requirements - Chris Schreiber
14:00 - 14:30 Systems Engineering Concept Model (SECM) Status Update - John Watson
14:30 - 15:00 Break
15:00 - 16:15 Structure Concepts and draft
RFP requirements - Hans Peter de Koning
16:15 - 17:00 Interface Concepts and draft
RFP requirements - Marc Sarrel
Thursday, March 23, 2017
09:00 - 09:45 Behavior Concepts (preliminary discussion only)
09:45 - 10:30 Requirements Concepts and draft
RFP requirements
10:30 - 11:00 Break
11:00 - 11:30 Variant Concepts and draft
RFP requirements
11:30 - 12:00 Common Element Concepts and draft
RFP requirements
12:00 - 13:00 Lunch
13:00 - 13:30 Requirements for standard file format and transformation between SysML versions – TBD
13:30 - 14:00 Requirements for SysML/UML Interoperability – Ed Seidewitz
14:00 - 15:00 SysML v2
RFP Planning - Sandy/All
Draft available for June 5 presentation to ADTF
Conformance levels
Prototype plan to support
RFP Issue at Sept Mtg
Identify
RFP review passes
Define review approach (e.g., requirements, glossary, ..)
Presentations