User Tools

Site Tools


sysml-roadmap:interface_concepts_modeling_core_team

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
sysml-roadmap:interface_concepts_modeling_core_team [2016-09-08 12:55]
msarrel [References]
sysml-roadmap:interface_concepts_modeling_core_team [2017-01-25 09:58]
msarrel [References]
Line 1: Line 1:
 Back to the[[http://​www.omgwiki.org/​OMGSysML/​doku.php?​id=sysml-roadmap:​systems_engineering_concept_model_workgroup| Systems Engineering Concept Model (SECM) Working Group Wiki]] Back to the[[http://​www.omgwiki.org/​OMGSysML/​doku.php?​id=sysml-roadmap:​systems_engineering_concept_model_workgroup| Systems Engineering Concept Model (SECM) Working Group Wiki]]
-====== Interface Concepts Modeling ​Core Team ======+====== Interface Concepts Modeling ​Focus Team ======
  
 ===== Objectives ===== ===== Objectives =====
  
-===== Starting Point ===== +===== Members ​===== 
- +Marc Sarrel 
-===== Limitations of SysML v1 ===== +Steve Hetfield 
- +===== The Interface Modeling Team ===== 
-===== Driving Requirements ​===== +^ Name ^ Organization ^ email ^ 
- +| Steve Hetfield | BAE | <​[email protected]>​ | 
-===== Requirements Analysis ===== +| Marc Sarrel | JPL | <​[email protected]>​ |
- +
-===== Derived Requirements =====+
  
 +===== SE Needs for Interface Modeling =====
 +  * {{sysml-roadmap:​interface_needs_r7.docx|Interface Needs Document 6 June 2016}}
 +  * {{sysml-roadmap:​interface_needs_review_slides_6-7-2016.pptx|Interface Needs Model Diagrams Review 7 June2016}}
 +  * {{sysml-roadmap:​ecss-e-st-10-24c_1june2015_.pdf|Space engineering Interface management, ECSS-E-ST-10-24C,​1 June 2015}}
  
  
Line 22: Line 24:
 == INCOSE IS 2015 == == INCOSE IS 2015 ==
  
-  * {{sysml-roadmap:​incose_is2015_paper_submission_29_v2.pdf|Paper}} +  * {{sysml-roadmap:​incose_is2015_paper_submission_29_v2.pdf|"A Representative Application of a Layered Interface Modeling Pattern";​ P. Shames, M. Sarrel, S. Friedenthal;​ JPL, California Institute of Technology}} 
-  * {{sysml-roadmap:​layered_interfaces_incose_is_2015_v4.pptx|Slides}}+  * {{sysml-roadmap:​layered_interfaces_incose_is_2015_v4.pptx|Presentation 'A Representative Application of a Layered Interface Modeling Pattern'​}}
  
 == AIAA SpaceOps 2016 == == AIAA SpaceOps 2016 ==
Line 128: Line 130:
   * {{ :​sysml-roadmap:​interface_concepts_team_update_-_revdraft_mas.pptx | Draft slides as of today}}   * {{ :​sysml-roadmap:​interface_concepts_team_update_-_revdraft_mas.pptx | Draft slides as of today}}
   * {{ :​sysml-roadmap:​interface_requirements_v6.xlsx | Interface Requirements Spreadsheet V6}}   * {{ :​sysml-roadmap:​interface_requirements_v6.xlsx | Interface Requirements Spreadsheet V6}}
 +
 +== 2016-09-10 ==
 +
 +  * {{ :​sysml-roadmap:​interface_concepts_team_update_-_revdraft_mas_v2.pptx | Draft slides V2}}
 +  * {{ :​sysml-roadmap:​interface_requirements_v7.xlsx | Interface Requirements Spreadsheet V6}}
 +
 +== 2016-09-15 ==
 +
 +  * {{ :​sysml-roadmap:​interface_concepts_team_update_-_revdraft_mas_v5.pptx | Interface Concepts Team Update}}
 +  * {{ :​sysml-roadmap:​interface_requirements_v8.xlsx | Interface Requirements}}
 +
 +== 2016-10-20 ==
 +
 +Sandy Friedenthal,​ John Watson, Steve Hetfield, Marc Sarrel
 +
 +Met to discuss priorities for interfaces concept model, and how that fits in with requirements concept model.
 +
 +  * {{ :​sysml-roadmap:​secm_requirements_concepts_diagrams_10-13-16.pptx | SECM Requirements Concepts Diagrams 2016-10-13}}
 +
 +  * Near term (present and publish for review at December 6th OMG meeting)
 +    * Mature the interface concept model and corresponding text requirements.
 +    * Integrate requirements concepts with interface concepts and update the interface concept model and propose updates to the requirements concept model.
 +    * Integrate Modelica style constraints for physical layer of interfaces into Interface Concept Model.
 +    * Develop examples that illustrate the interface concepts and their integration with the requirements concepts.
 +  *Longer term
 +    * Update the interface concept model and corresponding text requirements based on feedback from the Dec 6th meeting.
 +
 +== 2016-10-24 ==
 +
 +Steve Hetfield, Marc Sarrel
 +
 +Actions for next Monday, Oct 31.
 +
 +  * Filter interface requirements and assign IDs.  (Marc)
 +  * Import requirement text and link to concept model. ​ (Marc)
 +  * Align concepts and requirements. ​ (Marc)
 +  * Talk to Bjorn about Modelica. ​ (Marc)
 +  * Identify and sketch interface examples for Coronado meeting, Dec 6.  (Steve)
 +
 +== 2016-12-08 ==
 +
 +Presentation at Coronado meeting.
 +
 +  *{{ :​sysml-roadmap:​interfaces_2016-12-08.pptx | Interface Concepts 2016-12-08 at Coronado}}
 +
 +== 2017-01-25 ==
 +
 +Deep Properties Example
 +
 +  *{{ :​sysml-roadmap:​deep_properties_2.zip | Deep Properties}}
sysml-roadmap/interface_concepts_modeling_core_team.txt · Last modified: 2017-03-28 23:01 by msarrel