User Tools

Site Tools


sysml-roadmap:systems_engineering_concept_model_workgroup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
sysml-roadmap:systems_engineering_concept_model_workgroup [2016-12-25 11:07]
sfriedenthal [Presentations]
sysml-roadmap:systems_engineering_concept_model_workgroup [2017-09-17 12:18] (current)
jwatson [The SECM Working Group Team]
Line 12: Line 12:
 | Rick Steiner | Skygazer Consulting | <​[email protected]>​ | | Rick Steiner | Skygazer Consulting | <​[email protected]>​ |
 | John Watson (Lead)| Lockheed Martin - Retired | <​[email protected]>​ | | John Watson (Lead)| Lockheed Martin - Retired | <​[email protected]>​ |
 +
 +===== SysML v2 RFP - Extracted SECM Documents =====
 +  * {{ :​sysml-roadmap:​sysml_v2_reqt_support_doc_16_sept_2017_validation_8.docx |SysML v2 Requirement Support Document, PRELIMINARY v8, 16 Sept 2017 }}
 +
 +
  
  
Line 160: Line 165:
  
 [[Property Modeling Core Team|Link to "​Property & Expression Modeling Focus Team" Wiki Page]] [[Property Modeling Core Team|Link to "​Property & Expression Modeling Focus Team" Wiki Page]]
- 
-=== SE Needs Reference Material === 
-  * {{sysml-roadmap:​secm_-_property_thoughts_r5.docx|Property Thoughts R5}} 
-  * {{sysml-roadmap:​sysml_v2_rfp_properties_comments_b4_20151207.xlsx|Property Comment Spreadsheet}} 
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
Line 176: Line 177:
 [[Interface Concepts Modeling Core Team| Link to "​Interface Concepts Modeling Focus Team" Wiki Page]] [[Interface Concepts Modeling Core Team| Link to "​Interface Concepts Modeling Focus Team" Wiki Page]]
  
- 
-=== SE Needs Reference Material === 
-  * {{sysml-roadmap:​interface_needs_r7.docx|Interface Needs Document 6 June 2016}} 
-  * {{sysml-roadmap:​interface_needs_review_slides_6-7-2016.pptx|Interface Needs Model Diagrams Review 7 June2016}} 
-  * {{sysml-roadmap:​ecss-e-st-10-24c_1june2015_.pdf|Space engineering Interface management, ECSS-E-ST-10-24C,​1 June 2015}} 
-  * "A Representative Application of a Layered Interface Modeling Pattern";​ P. Shames, M. Sarrel, S. Friedenthal;​ JPL, California Institute of Technology (Link to be provided when published) 
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
Line 188: Line 183:
 [[Requirement Concepts Modeling Core Team| Link to "​Requirement and Verification Concepts Modeling Focus Team" Wiki Page ]] [[Requirement Concepts Modeling Core Team| Link to "​Requirement and Verification Concepts Modeling Focus Team" Wiki Page ]]
  
-=== SE Needs Reference Material === 
- 
-  * Go to "​Requirement and Verification Concepts Modeling Focus Team" Wiki Page under the heading "​Starting Point" 
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
Line 196: Line 188:
  
  
-==== 4.   ​Structure/​Behavior ​Concepts Modeling Focus Team ====+==== 4.   ​Structure Concepts Modeling Focus Team ====
  
-[[Structure/​Behavior Concepts Modeling Core Team Wiki Page |Link to "​Structure/​Behavior ​Concepts Modeling Focus Team" Wiki Page ]]+[[Structure/​Behavior Concepts Modeling Core Team Wiki Page |Link to "​Structure Concepts Modeling Focus Team" Wiki Page ]]
  
 === SE Needs Reference Material === === SE Needs Reference Material ===
Line 213: Line 205:
  
 =====   ​------------------------------ ​  ===== =====   ​------------------------------ ​  =====
 +
 +==== 6.   ​Behavior Concepts Modeling Focus Team ====
 +
 +[[Behavior Concepts Modeling Core Team |Link to "​Behavior Modeling Focus Team" Wiki Page ]]
 +
 +
 +=== SE Needs Reference Material ===
 +
 +
 +=====   ​------------------------------ ​  =====
 +
  
 ==== X.   ​Template for Next Concepts Modeling Focus Team ==== ==== X.   ​Template for Next Concepts Modeling Focus Team ====
Line 226: Line 229:
  
 ===== SysML v2 RFP Material ===== ===== SysML v2 RFP Material =====
 +  * {{ :​sysml-roadmap:​secm_work_area_guidelines_21_apr_2017.pdf |SECM Work Area Guidelines, 21 Apr 2017}}
 +  * {{ :​sysml-roadmap:​sysml_v2_rfp_reqts_examples.xlsx |SysML v2 RFP Requirement Examples, 21 Apr 2017}}
   * {{ :​sysml-roadmap:​sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}}   * {{ :​sysml-roadmap:​sysml_v2_glossary_23_dec_2016.docx |SysML v2 Glossary 23 Dec 2016}}
   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}   * {{ :​sysml-roadmap:​sysml_v2_glossary_07_dec_2016.docx |SysML v2 Glossary 07 Dec 2016}}
Line 262: Line 267:
   * {{sysml-roadmap:​secm_status_06-23-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx|SECM Status, OMG Tech Meeting, Orlando FL, Systems Modeling Roadmap and Assessment Mtg 06-23-2016}}   * {{sysml-roadmap:​secm_status_06-23-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx|SECM Status, OMG Tech Meeting, Orlando FL, Systems Modeling Roadmap and Assessment Mtg 06-23-2016}}
   * {{ :​sysml-roadmap:​secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}}   * {{ :​sysml-roadmap:​secm_status_09-15-2016_omg_tech_meeting_systems_modeling_roadmap_and_assessment_mtg_-_watson.pptx |SECM Status, OMG Tech Meeting, Chicago IL, SysML v2 RFP Working Group Meeting, 09-15-2016}}
-  * {{ :​sysml-roadmap:​secm_status-omg_tech_meeting_coronado_ca_sysml_v2_rfp_working_group_meeting-12-08-16.pptx |SECM Status-OMG Tech Meeting Coronado CA, SysML v2 RFP Working Group Meeting, 12-08-2016}}+  * {{ :​sysml-roadmap:​secm_status-omg_tech_meeting_coronado_ca_sysml_v2_rfp_working_group_meeting-12-08-16.pptx |SECM StatusOMG Tech Meeting Coronado CA, SysML v2 RFP Working Group Meeting, 12-08-2016}} 
 +  * {{ :​sysml-roadmap:​secm_model-based_specification_approach_r2_-_omg_mtg_reston_va_21_mar_2017.pptx |SECM, RFP Model Based Specification Approach, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-21-2017}} 
 +  * {{ :​sysml-roadmap:​secm_status_03-22-2017_omg_tech_meeting_sysml_v2_rfp_working_group_mtg_reston_va_-_watson.pptx |SECM Status, OMG Tech Meeting Reston VA, SysML v2 RFP Working Group Meeting, 03-22-2017}}
 ==  == ==  ==
 ==  == ==  ==
sysml-roadmap/systems_engineering_concept_model_workgroup.1482682031.txt.gz · Last modified: 2016-12-25 11:07 by sfriedenthal