This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
dido:public:s_cli:05_contents:02_prt:supply:03_theory:02_issue:01_opc:start [2021/05/21 16:48] nick |
dido:public:s_cli:05_contents:02_prt:supply:03_theory:02_issue:01_opc:start [2022/02/03 20:35] (current) 52.45.51.99 ↷ Links adapted because of a move operation |
||
|---|---|---|---|
| Line 2: | Line 2: | ||
| [[dido:public:s_cli:05_contents:02_prt:supply:start| User Scenario: Supply Chain]] | [[dido:public:s_cli:05_contents:02_prt:supply:start| User Scenario: Supply Chain]] | ||
| - | As part of the OP, Sal downloads the DIDO Platform selected by the OPC (we refer to this as DIDO Platform O). The OPC have defined several Data Objects (DOs) that they are going to have on their DIDO. When a DO is deployed to a DIDO, it is referred to as a Smart Contract. | + | As part of the OP, Sal downloads the [[dido:public:ra:xapend:xapend.a_glossary:d:dido_platform |
| + | |DIDO Platform]] selected by the OPC (we refer to this as DIDO Platform O). The OPC have defined several [[dido:public:ra:xapend:xapend.a_glossary:d:data_object]] that they are going to have on their DIDO. When a DO is deployed to a DIDO, it is referred to as a [[dido:public:ra:xapend:xapend.a_glossary:s:smart_contract|Smart Contract]]. | ||
| ===== 1.1 DO: Track ===== | ===== 1.1 DO: Track ===== | ||