This is an old revision of the document!
MBSE Patterns Working Group Participation in INCOSE IW2018, Jacksonville, FL:
agenda--jan_2018_mtgs_of_mbse_patterns_wg_at_iw2018_v1.4.1.pdf
Jan 21 2018 Patterns WG Projects Status Summary:
pbse_wg_meeting_slides_iw_2018_jan_2018_v1.4.1_selections_for_01.21.pdf
Patterns 101:
pbse_extension_of_mbse--methodology_summary_v1.5.5a.pdf
pbse_tutorial_glrc_2016_v1.7.4.pdf
Jan 21 MBSE Workshop report on MBSE Patterns VVUQ:
standardizing_v_v_of_models_iw2018_mbse_workshop_report_01.21.2018_v1.2.1.pdf
planning_and_survey_instrument_v1.2.5.pdf
Jan 20 Agile WG review of 2018 INCOSE INSIGHT Article on ASELCM Pattern Case Study:
incose_insight_agile_se_issue_article_--_schindel_v1.3.2.pdf